Electrician Quote Template UK: Rewires, Consumer Units and the Part P Line
Electrical quotes carry something most trades don't: a legal paper trail. Part P notification, an Electrical Installation Certificate, and (on condition reports) coded observations the client may not understand. A good electrical quote doesn't just price the work — it says who is certifying it, who is notifying it, and what happens when a rewire opens up a wall and finds a horror show.
This guide gives you a template built for that, plus 2026 benchmark prices. For the fundamentals that apply to every trade, start with how to write a contractor quote that wins jobs.
What Makes Electrical Quotes Different
1. Certification is part of the product The client isn't just buying cable and labour — they're buying the EIC or Minor Works Certificate that makes the work legal and sellable with the house. Put certification on the quote as its own visible line, even at £0. It's proof you're doing the job properly, and it separates you from the cheaper quote that's silent about it.
2. Part P: say who notifies Notifiable work (new circuits, consumer unit changes, most work in bathrooms) must be notified to building control. If you're registered with a competent person scheme (NICEIC, NAPIT, ELECSA), you self-certify — say so on the quote, by name and registration number. If you're not, the client pays building control fees, and that needs to be in writing before the job starts, not discovered after.
3. Old installations bite Rewire quotes are written before the walls are open. Undersized bonding, rotten rubber cable, DIY spurs feeding half the kitchen — you'll find something. The contingency note below handles it.
Electrician Quote Template
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[COMPANY NAME] — Electrical Contractors
[Address] | [Phone] | [Email]
[VAT No. if registered]
[NICEIC / NAPIT registration no.]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ELECTRICAL QUOTATION
Reference: [REF]
Date: [DD/MM/YYYY]
Valid until: [DD/MM/YYYY — 30 days recommended]
Prepared for:
[Client Name]
[Property Address]
[Postcode]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
PROJECT
[e.g. Full rewire of 3-bedroom semi-detached house,
including new consumer unit, to current BS 7671.
All work notifiable under Part P — self-certified
via [scheme].]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
SCOPE OF WORKS
First fix
□ Isolate and strip out existing wiring to [circuits/areas]
□ Install new cabling: [X] lighting circuits, [X] ring
finals, [X] radials ([cooker / shower / EV charger])
□ Chase and cap to [walls as required / minimise chasing
— surface run in agreed areas]
Second fix
□ Fit [X] sockets, [X] switches, [X] light points in
[brand/range, finish]
□ Supply and install [X]-way consumer unit with SPD and
RCBO protection to each circuit
□ Upgrade main earthing and bonding to current standard
Testing & certification
□ Full inspection and test on completion
□ Electrical Installation Certificate (EIC) issued
□ Part P building control notification via [scheme] —
certificate posted to client and lodged against the
property
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
COST BREAKDOWN
£
Labour ([X] days, [X] electricians) [XXXX]
Cable, containment & accessories [XXXX]
Consumer unit & protective devices [XXXX]
Fixtures and fittings [XXXX]
Testing, certification & notification [XXXX]
────────
Sub-total [XXXX]
VAT @ 20% [if registered] [XXXX]
────────
TOTAL [XXXX]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
EXCLUSIONS (NOT INCLUDED)
• Plastering and making good beyond filling of chases
• Decoration
• Remedial work on parts of the installation outside the
stated scope (quoted separately if found necessary)
• Builder's work (lifting/refitting floor coverings,
moving furniture, removing built-in units)
CONTINGENCY NOTE
This quotation is based on the installation as inspected
on [date]. Concealed defects — deteriorated cable,
non-compliant earlier alterations, inadequate earthing —
are only visible once work opens up. Anything found will
be reported and priced in writing before any additional
work proceeds.
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
PROGRAMME
Estimated start: [Date]
Estimated duration: [X] days
Power will be off to the whole property for approximately
[X] days during changeover.
PAYMENT TERMS
Deposit ([25–30]%) on acceptance: £[XXXX]
Balance on completion and issue of certification: £[XXXX]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to Price Electrical Work
General UK benchmarks, checked 31 August 2026 against current UK cost guides (adjust for region, spec and access — London and the South East run 20–30% higher):
- Full rewire, 3-bed house: £4,500–£7,500, typically 5–8 days
- Consumer unit replacement: £450–£950 including testing, EIC and notification
- EICR (condition report): £125–£300 depending on property size
- Day rate, domestic work: £250–£350 outside London; £450–£650 in London and the South East
These are sanity checks, not prices. Your rate should come from your own overheads and billable days — our free day rate calculator does that sum properly.
Common Electrical Quote Mistakes
Burying certification in the small print Certification and notification are your professional edge over the cash-in-hand quote. Make them visible line items.
Quoting a rewire without saying who makes good Chasing walls makes mess. If your price includes filling chases but not skimming, say exactly that — "making good" disputes are the electrical trade's version of the scaffolding argument.
Silence on power-off time A family discovering on day two that the power is off for three more days is a one-star review waiting to happen. Put the outage in the quote.
Vague accessory specification "Fit sockets and switches" invites the client to imagine brushed steel while you priced white plastic. Name the range.
Related guides
- Speqly for Electricians — quoting software built for your trade
- How to write a contractor quote that wins jobs
- Handling "your quote is too expensive"
- Best quoting software for UK contractors
Frequently Asked Questions
How much should an electrician charge per day in the UK?
£250–£350 a day for domestic work outside London, and £450–£650 in London and the South East (2026 figures). Testing-and-inspection specialists typically sit at £280–£380. Base your own rate on your overheads and real billable days, not the regional average.
How much does it cost to rewire a 3-bed house in 2026?
£4,500–£7,500 is the current UK benchmark for a full rewire of a three-bed house including a new consumer unit, certification and notification, taking 5–8 days. Occupied houses, solid walls and high-spec accessories push it up.
What electrical work is notifiable under Part P?
In England: new circuits, consumer unit replacements, and most new work in bathrooms and other special locations. A scheme-registered electrician self-certifies; otherwise building control must be involved at the client's cost. Your quote should say which applies.
Should the quote include an EICR?
For rewires, no — a full rewire ends with an EIC, which supersedes it. An EICR belongs on quotes for buying/selling, landlord compliance (legally required for rented homes), or when a client wants the installation assessed before deciding on work.
Stop Losing Electrical Work on Paperwork
Speqly turns your site photos into a professional, priced proposal in about 10 minutes — itemised costs, visuals, and a one-tap accept button. Send it before the other spark has found a pen.
Stop Losing Jobs on Paperwork
Speqly turns your site photos into a professional proposal in under 10 minutes. Before/after visuals, itemised costs, one-tap accept.
Try Speqly Free